Description: Bikeway class designation. (Class 1 = separated shared-use paths; Class 2 = bike lanes; Class 3 = bike route often with sharrows; PED = pedestrian sidewalk)
Name: Proposed Active Transportation Facilities - 75ft buffer
Display Field: created_user
Type: Feature Layer
Geometry Type: esriGeometryPolygon
Description: Active transportation facilities are denoted by class, where Class 1 is a separated shared-use path; Class 2 is a bike lane; Class 3 is a bike route; Class 5 are complete street improvements; Class 0 is sidewalk. Complete Streets refers to a segment where transportation and stormwater elements are identified and the exact facilities are not yet determined. Proposed projects may be planning, design, or construction phases, and the completion year refers to the year when the project is slated for construction. Data is updated ad hoc, as projects are identified or constructed, and every four years as part of the Active Transportation Plan. Last updated in Spring 2024.
Description: Microtransit service area includes service provided by Lake Link, on the South Shore, and TART Connect, on the North Shore, as of October 2022. TART Connect is divided into five service area zones covering the North Shore and Lake Link has one service area zone for the South Shore. This layer will be updated on an as needed basis, as microtransit service areas change.
Service Item Id: 4df48044bf75479da10a9e4aafb22c27
Copyright Text: South Shore Transportation Management Association (SSTMA), Tahoe Truckee Area Regional Transit (TART), and Tahoe Regional Planning Agency
Description: EIP = EIP Project #. Projects can be viewed online at https://eip.laketahoeinfo.org/PROJECT_NAME = Name of project as listed in the EIPIMPLEMENTER = Lead implementing agencySTART_YEAR = Project implementation start yearCOMPLETE_YEAR = Project implementation complete yearFUNDING_TYPE = Denotes whether the project is a capital project or a project that requires operations and maintenance fundsESTIMATED_COST = Estimated total cost of the project in 2020 dollarsTOTAL_COST = Estimated total cost of the project in the year of expenditureCONSTRAINT = Denotes whether the project is constrained (funded) or unconstrained (unfunded)PLAN = Lists which short-range plan the project is listed in (i.e. Active Transportation Plan, Transit Master Plan, Short-Range Transit Plan, etc.)VOTES = Number of project "likes" collected during online public engagementCOMMENTS = List of project comments collected during online public engagement
Description: The purpose for these boundaries is to provide zones to analyze transportation needs and alternatives for the Lake Tahoe Region to meet the Tahoe Regional Planning Agency thresholds, as well as conform to local, state, and federal regulations.
Description: STOP_NAME: Name of bus stop, usually containing cross streets and other location identifiers.STOP_ID: ID number assigned to each bus stop for use by transit operators.
Service Item Id: 4df48044bf75479da10a9e4aafb22c27
Copyright Text: Tahoe Transit AVL data - Trillium
Shapefile created by Kira Smith, July 2017